On this page
article
Update Sub-design
Workflow command, not a block: it places nothing. It re-reads the interface of a sub-design page and rebuilds every instance of it already on the current sheet, preserving the wiring that still matches. Run it after changing the ports of a sub-design and re-synchronising the page.